Skip to report
Chief / BettterAI · all five projectsStatus v4 · 16 Nov 2026, 04:50 UTC · updated at this address

This week's plan: 16–22 Nov 2026

1 of 13 items is live and checked (the New Year goal view on ops), 2 more are merged into the platform's QA (trouser fit typology, inventory assistant), and the rest are being built; your 3 questions still hold back parts of the trouser and blazer work.

Building · 1 of 13 live for users · 2 merged to QA · 3 questions for you

Where the 13 plan items are

Started10 items
Developed2 items
Deployed to users0 items
Verified on prod1 items
Source: Each item counted once at its furthest stage, from the sessions' own status reports, 16 Nov 2026, 04:50 UTC. 4 items are partly held by an open question.

Blocked — needs you 3

  1. B1
    Raw material 0171-B 56: which pattern file is right?

    Its file was replaced on 11 Nov (revision 8) with one that has no readable front, so 8 blazer pairs Elena approved fail on every version.

    Recommended: Put back revision 6 and keep revision 8 in the history.

    Holds back: P1.4, P2.1 (bz-010, 108, 128, 148, 160, 183, 195, 205)

  2. B2
    ANDES WOOL (tr-061): remove it from the platform library?

    Elena asked for it: it is cut directly from fabric, not adapted. The adapter already leaves it out.

    Recommended: Yes. Archive it (reversible) rather than delete it.

    Holds back: P1.2 if it is one of the 6 trouser designs

  3. B3
    Trousers release gate: score against Elena's latest platform verdicts instead of the tracker?

    Her platform verdicts (tr-007, tr-108) disagree with the tracker, so every trousers release has needed your exception. Blazers already use her platform verdicts.

    Recommended: Yes, as for blazers; the tracker score stays visible next to it.

    Holds back: P2.2 release

Everything else in these items goes ahead while they wait. Answer in the group chat or in Chief's Feedback tab.

Every plan item, by project

Developed = built and merged. Deployed to users = live on the version users open. Verified on prod = checked there by the session. Updated 16 Nov 2026, 04:50 UTC.

  1. Started
  2. Developed
  3. Deployed to users
  4. Verified on prod

Platform and library

RocketFrogPlatform · platform.bettter.us · library.bettter.us
0 of 5 deployedsession 136492130a: P1.1 (Working) · session 427c426a73: P1.2–P1.5 (Working)
  • P1.1
    Pre-selection rebuilt to Vlada's spec (rules-v6)Built and tested in PR #100 (general size table, tolerance vs 3:5:5:3, report, reservation on confirm). Merges after the other platform session releases, so the two don't collide.
    Users: not yet
    Why · done when

    Why: First step of the journey; Vlada's spec v1.0 (13 Nov) is final and adds a general size table, the 3:5:5:3 size target and stock reservation.

    Done when: The spec's 18 acceptance tests pass, v6 runs on prod on real library data, and Vlada confirms.

  • P1.2
    6 trouser designs available, trouser package importedIn progress: this week's packages are being rebuilt. The 6 trouser designs are not available on prod yet.Partly held: B2
    Users: not yet
    Why · done when

    Why: Your decision 16 Nov. Today the platform refuses live trouser jobs.

    Done when: A live trouser job runs on prod on library data.

  • P1.3
    Fit typology released for trousers (Grade stays held)Merged into QA (PR #98, 04:18 UTC). Reaches prod with the next platform release.
    Users: not yet
    Why · done when

    Why: Your decision 16 Nov; Vlada, 13 Nov: typology is missing for all trousers.

    Done when: Typology on prod matches the sheet for every trouser design.

  • P1.4
    This week's sheet pull to prod, with a two-values checkSheet changes merged into QA (PR #101: renamed shirt and T-shirt tabs, new Dress tab). The two-values list and the prod pull are not done yet.Partly held: B1
    Users: not yet
    Why · done when

    Why: Shirt and T-shirt data lands this week; the team agreed on one value per cell (13 Nov).

    Done when: The pull is on prod and the cells holding two values are listed for the team.

  • P1.5
    Inventory assistant v1 (internal, on Vlada's subscription)Merged into QA (PR #99, 04:27 UTC). Runs on QA on the subscription with a read-only library key. Not on prod yet.
    Users: not yet
    Why · done when

    Why: Vlada asked for it on 13 Nov; your decision 16 Nov: internal only, on Claude Code with her Bettter subscription, no API key.

    Done when: Live on prod for the team, answers stock questions with links to the records, Vlada has tried it.

Adapter

BettterAIDesignAdapter · adapter.bettter.us
0 of 3 deployedsession 0e07ee2c31: P2.1–P2.3 and 27 open feedback items (Working)

Live and checkedThe DXF converter opens without a password. convert.bettter.us ↗

Live and checkedEditor try-out: one drag bends a whole line, corners stay put (1 of 27 open feedback items verified; 9 wait on Elena, 3 on you).

  • P2.1
    Blazers v1.6.24: bring back what v1.6.23 lostBeing built (sleeve and body fixes). Then a full run, the release gate, publish.Partly held: B1
    Users: not yet
    Why · done when

    Why: Fixes Elena had accepted came back in v1.6.23 (steps on 14 + 28 pairs, sleeve vents, pocket openings).

    Done when: v1.6.24 is live on adapter.bettter.us and each item is checked there.

  • P2.2
    Trousers v0.12 with Elena's 3 new models (no master pattern)Being built: the new models labelled 'no master pattern', tr-081/tr-090, striped fabric. Scored against the tracker until you answer B3.Partly held: B3
    Users: not yet
    Why · done when

    Why: Elena, 13 Nov: three more models are ready in the tracker; your decision 16 Nov: add them with a label.

    Done when: The new models show on the live trousers pages with the label and a verdict.

  • P2.3
    Shirts: master patterns read into pieces and zonesLooking for the shirt master files. The first shirt pairs come from the team when ready.
    Users: not yet
    Why · done when

    Why: The New Year goal is the full journey in 4 categories.

    Done when: The shirt master patterns read correctly in the lab.

Tech Design Builder

BettterAIDesignBuilderTech · tech-builder.bettter.us
0 of 4 deployedsession 42f2cdd496: P3.1–P3.4 and 60 open feedback items (Working)
  • P3.1
    One numbering with Catarina's sheet (#1–#108)Tracker page with her sheet numbers built and tested on the branch; goes live with v0.8.7.
    Users: not yet
    Why · done when

    Why: She asked on 13 Nov to track everything in her sheet as Open / Fixed / Recurring.

    Done when: All 40 open or recurring numbers carry a status on the site.

  • P3.2
    The 9 recurring technical-drawing issues (#35–#43)Flats and DXF pieces being fixed; then deploy v0.8.7 and check on the live lab.
    Users: not yet
    Why · done when

    Why: They keep coming back after fixes.

    Done when: Live on tech-builder.bettter.us; Catarina marks them Fixed.

  • P3.3
    Plain language and feedback filtersOpen/closed filters built; the language items are being written.
    Users: not yet
    Why · done when

    Why: 10 open items in Language, Titles and Feedback of her sheet.

    Done when: Live on tech-builder.bettter.us; Catarina confirms.

  • P3.4
    Catarina's pending inputs, asked once in the builderHer questions written into the tracker; she sees them when v0.8.7 is live.
    Users: not yet
    Why · done when

    Why: Her S ranges table, keep limit, minutes per operation, samples and 3D decision gate several items.

    Done when: Asked in one message through the builder; each answer built as it arrives.

Ops

OperationalLayer · ops.bettter.us
1 of 1 deployedsession fe55f113a6: P4.1 and 4 open feedback items (Finished)

Waiting on others3 sites of another group still use the old feedback widget; the widget author confirms one layout fix.

  • P4.1
    New Year goal view on ops; 'Ask ✦' password; widget fixesLive and checked: one table, 4 categories × 5 journey steps, each with its source. 'Ask ✦' has no password of its own; it sits behind the ops login. Widget 1.3.0 (screenshot and layout fixes) live on ops and the lab.
    Users see it ↗
    Why · done when

    Why: No single place tracks Vlada's 5 Nov goal; the chat password removal was never confirmed.

    Done when: The view is live on ops.bettter.us and the widget fixes are checked.

Sales Design Builder

BettterAIDesignBuilder · paused
pausedno session

Paused by Vlada on 5 Nov so the team can focus on adaptations and the Tech Design Builder. No session this week.

Also open, not blocking this week (3)
  • Sales Design Builder (paused): restart it, perhaps on a lighter category, or keep it paused? Nothing this week depends on it.
  • Sales Design Builder: rebuild the October SDA library report from the platform library, or retire it?
  • Sales Design Builder: for brands' raw material, read the online shop, the outlet, or their unsold-stock file next?

New Year goal on ops: 20 journey steps (4 categories × 5 steps)

Works on prod2 steps
Partly blocked (reason shown on ops)12 steps
Not started6 steps
Source: ops.bettter.us New Year goal view, live 16 Nov 2026 04:14 UTC (OperationalLayer session fe55f113a6). Works on prod today: blazer pre-selection and the blazer adapter.

New Year goal: the full journey in 4 categories. Where it breaks today

  1. Library data

    The weekly sheet pull runs. Trouser raw materials are not imported yet. Shirt data is still being measured.

  2. Pre-selection

    The live rules-v5 covers her eligibility rules. Her 13 Nov spec adds general size tables, a size ratio and stock reservation.

  3. Adapter engine

    Blazers v1.6.23 and trousers v0.11 went live on 13 Nov. 5 fixes Elena had accepted came back.

  4. Live jobs

    Trouser jobs are refused until the 6 trouser designs are made available (decided 16 Nov).

  5. Tech pack per size

    A tech pack per design has been live since 9 Nov. Real adapted files wait on raw-material pattern files.

  6. Shirts, T-shirts

    Data is arriving. No adapter exists for either category yet.

Pre-selection: already live vs new in her spec

Live today (rules-v5, 9 Nov)

  • Measurement must fall between the min and max, both included
  • Construction excludes, fit typology must be allowed, an empty rule is skipped
  • Defects only add a notice
  • One design size per record (SKU + size + height)
  • Fit measured from the middle of each measurement band

New in spec v1.0 (13 Nov)

  • A general size table for designs without their own ranges (blazers by chest, XXS–XL)
  • A 3:5:5:3 size target for XS–L, weighed against fit
  • Moves a record off its best size only within the tolerance (v5 has no limit)
  • Flags missing or suspicious measurements; never converts a size label silently
  • Confirmed quantities are reserved in one step; over-allocation is blocked

Tech Design Builder: Catarina's comment tracker (shared 13 Nov)

Fixed67 comments
Open28 comments
Recurring: came back after a fix12 comments
Source: Design_Builder_Flow sheet, 'Open comments' tab, read 16 Nov 2026 00:50 UTC (107 numbered comments)
Decided on 16 Nov: your answers and what they change
  • Q1 Inventory assistant: an internal interface, run on Claude Code with Vlada's Bettter Claude subscription. P1.5 changes from spec-only to build: internal and read-only, with no API key and no paid fallback.
  • Q2 Fit typology for trousers: release it. P1.3 goes ahead; Grade stays held.
  • Q3 Elena's 3 new trouser models: add them and label them as having no master pattern. P2.2 goes ahead.
  • Q4 The 6 pending trouser designs: make them available; whoever has platform access gives feedback. P1.2 goes ahead.
  • Q5 Shirt pairs: they're ready when they're ready. That's no longer a question; P2.3 prepares the shirt master patterns and runs the pairs once they arrive.
Vlada's pre-selection spec: read in full
  • Access: the shared link opens without a login and was read in full on 16 Nov: 'Unified Preselection Logic', functional specification v1.0, 12 sections.
  • Goal: recommend the best design size for each raw-material record (SKU + size + height). The user then picks the design and confirms quantities. Nothing is reserved during pre-selection.
  • One set of rules with two measurement sources: a design's own ranges, or a general table for designs without them (blazers by chest width, XXS–XL; other categories need their own table).
  • Eligibility: the measurement is within range (inclusive), construction excludes, fit typology must be allowed, an empty rule is skipped, and defects only warn.
  • Optimisation: exactly one size per record, fit first, a 3:5:5:3 size target for XS–L, and a record moves off its best size only within a tolerance.
  • Allocation: confirmed quantities are reserved in one step, two users can't take the same stock, and released stock returns to available.
  • Acceptance: 18 tests. For example, the same SKU and size at two heights gives two records, and taking 30 of 50 leaves 20 available.
  • The spec leaves five technical points open and says how to handle them meanwhile. A, the tolerance: make it a setting, test several levels on real inventory, and let Vlada and R&D choose. B, ratios beyond XS–L: invent none and only show the distribution. C, the trouser size table: flag trouser designs without their own ranges rather than guess. D, data quality: flag missing or suspicious measurements and never convert UK/US labels silently. E, stock integrity: reserve in one step.
Waiting on the team (not questions)
  • A general size table for trousers (spec point C). Until then, trouser designs without their own ranges are flagged.
  • Size ratios beyond XS–L (spec point B). Until then, the distribution is shown but not optimised.
  • The tolerance choice after the test runs (spec point A): Vlada and R&D.
  • Catarina's inputs for the Tech Design Builder (P3.4).
  • The first shirt adaptation pairs (P2.3).
What happened since Friday
  • Fri 13 Nov 09:33 UTC · Catarina · Slack #rnd_adaptations_tech: shared the 'Design_Builder_Flow' sheet with the target flow, sizing rules and 107 comments, each with a status. Goes to P3.1–P3.4.
  • Fri 13 Nov 10:11 UTC · Elena · Slack #rnd_adaptations_tech: three more trouser models are ready in the Adaptation Tracker, without a master pattern. Goes to P2.2.
  • Fri 13 Nov 10:18 UTC · Sara · Slack thread on the 2 Nov plan: trouser and shirt selection and measurements are done; T-shirts are selected; measuring of 23 shirts has started. Goes to P1.4 and P2.3.
  • Fri 13 Nov 10:20 UTC · Vlada · Slack DM to Bohdan: sent the final pre-selection logic. Bohdan replied 'will do' at 14:33. Goes to P1.1.
  • Fri 13 Nov 10:51 UTC · Vlada · Slack DM to Bohdan: fit typology is missing for all trousers; asked for an AI agent in the raw-material section. Goes to P1.3 and P1.5.
  • Fri 13 Nov 10:55 UTC · Vlada to Inês and Catarina · Slack thread of 5 Nov: shirts come after trousers in the data priority; no Bermudas now. Goes to P1.4 and Waits.
  • Fri 13 Nov 11:16 UTC · Vlada, with replies from Sara, Catarina and Inês · Slack #rnd_adaptations_tech: one value per cell; shirt sizes as letters only. Goes to P1.4.
  • Mon 16 Nov 00:13 UTC · Bohdan · Slack DM to Vlada: the AI agent is an assistant that answers any question about the inventory, 'medium complexity'. Goes to P1.5.
Shipped Thursday night and Friday (don't redo)
  • Adapter: blazers v1.6.23 and trousers v0.11 went live on prod on 13 Nov with Elena's 12 Nov review built in (32 items, 44 editor versions). PRs #76–#78.
  • Tech Design Builder: v0.8.6 went live on prod and QA at 00:54 UTC on 13 Nov, with Catarina's 31 notes of 12 Nov built in (26 done, 5 with a question).
  • Platform: a feedback screenshot can no longer block a comment (release #94, 00:09 UTC on 13 Nov). This fixes the freeze Vlada reported on 12 Nov; she hasn't confirmed it yet.
  • Platform: the Tech Design Builder shows the raw material as a product card and the designs as a gallery (release #96, 00:51 UTC on 13 Nov).
  • These come from the projects' own status pages and merge records. I didn't open the live sites; they need a login.
Sources and coverage
  • Slack: all 26 chats this group can read, from 21:00 UTC Thu 12 Nov to 00:45 UTC Mon 16 Nov. I also checked replies on threads started since 25 Oct.
  • Telegram: no chats are connected to this group. Calls: none recorded.
  • Sheets: Design_Builder_Flow (3 tabs) and the Adaptation Tracker (trousers tab), read 16 Nov. Vlada's spec: her shared link, read 16 Nov.
  • The live pre-selection: the platform repository's main branch (rules-v5). Project state: each repository's main branch and status page.
  • This page leaves out credentials, payment details, private links and the spec's size numbers.
  • Status of each item: the five sessions' own status tables and Chief's session records. A stage moves only on the session's evidence (merge, release, check on the live site).
Update log
  • v4, 16 Nov 2026 04:50 UTC: P4.1 live and checked on ops; P1.3 and P1.5 merged into the platform's QA (PRs #98, #99); P1.1 built in PR #100; DXF converter password removed; New Year goal chart added.
  • v3, 16 Nov 2026 03:45 UTC: you asked to implement all items; 5 sessions started (2 platform, adapter, Tech Design Builder, ops), one per project or group of items. The plan became a status board. 3 owner questions recorded by earlier adapter tasks hold back parts of P1.2, P1.4, P2.1 and P2.2.
  • v2, 16 Nov 2026 01:15 UTC: your answers to Q1–Q5 went into the plan; Vlada's pre-selection spec was read and mapped against the live rules-v5; P1.5 changed from spec-only to build on the subscription; no open questions remain.
  • v1, 16 Nov 2026 01:00 UTC: first plan from the Friday–Monday sources, with 5 open questions.